Slurry Pump Parts for Gold Mining

Reliable replacement parts for slurry pumps used across the entire gold processing circuit — from crushing to tailings.

Gold Mining Pump Applications

Slurry pumps are critical at every stage of gold processing. Our parts keep your circuit running at peak efficiency.

⛏️

CIL/CIP Circuit

Carbon-in-leach and carbon-in-pulp circuits use heavy-duty slurry pumps for slurry transfer between leach tanks. High-abrasion conditions demand A05 impellers and rubber liners.

🌊

Classifier & Cyclone Feed

Hydrocyclone feed pumps operate under high pressure with abrasive classification slurries. R26 rubber impellers resist fine-particle erosion.

🏭

Flotation Circuit

Flotation feed and tailings pumps handle chemically treated slurry. Corrosion-resistant materials like R26 and D21 stainless steel are recommended.

💧

Tailings Disposal

Tailings pipeline pumps move high-volume, low-density slurry over long distances. Large-frame AH pumps with A05 impellers are the standard.

🧪

Acid/Reagent Transfer

Cyanide and acid circuits require chemical-resistant elastomers. Our R26 chlorobutyl rubber parts handle pH levels down to 1.5.

⚙️

Milling Circuit

SAG and ball mill discharge pumps handle the heaviest slurry loads. High-chrome A05 impellers and liners provide maximum wear life.

Recommended Parts for Gold Mining

Based on common gold processing circuit configurations, we recommend the following parts and materials.

Circuit Stage Pump Type Recommended Parts Material
Milling / SAG Discharge Warman AH 8/6, 10/8 Impeller, Volute Liner, Frame Liner, Shaft Sleeve A05 High Chrome
Cyclone Feed Warman AH 4/3, 6/4 Impeller, O-Ring Kit, Seal A05 / R26
CIL/CIP Transfer Warman AH 3/2, 4/3 Impeller, Volute Liner, Gaskets A05 / R33
Flotation Warman AH 4/3, 6/4 Impeller, Liner, Seal, O-Ring Kit R26 Chlorobutyl
Tailings Pipeline Warman AH 10/8, 12/10 Impeller, Volute Liner, Throatbush A05 High Chrome
Acid/Reagent Transfer Various Impeller, Seal, O-Ring Kit R26 / D21 Stainless

Case Study

How a gold mine in West Africa reduced pump parts costs by 60%.

Gold Processing Plant — West Africa

A 5,000 TPD gold processing operation was spending over $180,000 annually on OEM Warman AH pump parts across their CIL circuit. After switching to Coolair Group compatible parts:

  • 60% cost reduction — Annual parts spend dropped to $72,000
  • Identical wear life — A05 impellers lasted the same 3,500 hours as OEM
  • 14-day delivery — Parts delivered to site within 2 weeks of order
  • Zero downtime — Exact-fit parts required no modifications

"The material certification reports were key to getting our QA department on board. The chemical composition matches the OEM spec exactly." — Plant Maintenance Manager

Optimize Your Gold Mining Pump Circuit

Tell us about your gold processing operation — circuit type, pump models, and current parts spend. We'll provide a cost-saving recommendation.

Request Assessment →